Chapter 4. Migrating within a maintenance window


For environments where downtime is acceptable, follow this simpler sequential process.

Prerequisites

Perform a dry run migration in a staging environment to estimate the timing of the data export and import phases accurately. Once you are satisfied with the results, proceed with the production migration.

Procedure

  1. Stop all client applications that connect to Apicurio Registry 2.6.
  2. Export data from Apicurio Registry 2.6 using the export script. See Migration scripts reference.
  3. Shut down Apicurio Registry 2.6.
  4. Deploy Apicurio Registry 3.x with updated configuration. See Updating registry configuration.
  5. Import data into Apicurio Registry 3.x using the import script. See Migration scripts reference.
  6. Validate the import using the verification scripts. See Migration scripts reference.
  7. Update client application configurations to point to Apicurio Registry 3.x. See Migrating Apicurio Registry client applications.
  8. Start client applications.
Red Hat logoGithubredditYoutubeTwitter

詳細情報

試用、購入および販売

コミュニティー

Red Hat ドキュメントについて

Red Hat をお使いのお客様が、信頼できるコンテンツが含まれている製品やサービスを活用することで、イノベーションを行い、目標を達成できるようにします。 最新の更新を見る.

多様性を受け入れるオープンソースの強化

Red Hat では、コード、ドキュメント、Web プロパティーにおける配慮に欠ける用語の置き換えに取り組んでいます。このような変更は、段階的に実施される予定です。詳細情報: Red Hat ブログ.

会社概要

Red Hat は、企業がコアとなるデータセンターからネットワークエッジに至るまで、各種プラットフォームや環境全体で作業を簡素化できるように、強化されたソリューションを提供しています。

Theme

© 2026 Red Hat
トップに戻る