Chapter 4. Migrating within a maintenance window


For environments where downtime is acceptable, follow this simpler sequential process.

Prerequisites

Perform a dry run migration in a staging environment to estimate the timing of the data export and import phases accurately. Once you are satisfied with the results, proceed with the production migration.

Procedure

  1. Stop all client applications that connect to Apicurio Registry 2.6.
  2. Export data from Apicurio Registry 2.6 using the export script. See Migration scripts reference.
  3. Shut down Apicurio Registry 2.6.
  4. Deploy Apicurio Registry 3.x with updated configuration. See Updating registry configuration.
  5. Import data into Apicurio Registry 3.x using the import script. See Migration scripts reference.
  6. Validate the import using the verification scripts. See Migration scripts reference.
  7. Update client application configurations to point to Apicurio Registry 3.x. See Migrating Apicurio Registry client applications.
  8. Start client applications.
Red Hat logoGithubredditYoutubeTwitter

자세한 정보

평가판, 구매 및 판매

커뮤니티

Red Hat 문서 정보

Red Hat을 사용하는 고객은 신뢰할 수 있는 콘텐츠가 포함된 제품과 서비스를 통해 혁신하고 목표를 달성할 수 있습니다. 최신 업데이트를 확인하세요.

보다 포괄적 수용을 위한 오픈 소스 용어 교체

Red Hat은 코드, 문서, 웹 속성에서 문제가 있는 언어를 교체하기 위해 최선을 다하고 있습니다. 자세한 내용은 다음을 참조하세요.Red Hat 블로그.

Red Hat 소개

Red Hat은 기업이 핵심 데이터 센터에서 네트워크 에지에 이르기까지 플랫폼과 환경 전반에서 더 쉽게 작업할 수 있도록 강화된 솔루션을 제공합니다.

Theme

© 2026 Red Hat
맨 위로 이동