6.2. Order Constraints


Order constraints determine the order in which the resources run. You can configure an order constraint to determine the order in which resources start and stop.
Use the following command to configure an order constraint.
pcs constraint order [action] resource_id then [action] resource_id [options]
Copy to Clipboard Toggle word wrap
Table 6.2, “Properties of an Order Constraint”. summarizes the properties and options for configuring order constraints.
Expand
Table 6.2. Properties of an Order Constraint
FieldDescription
resource_id
The name of a resource on which an action is performed.
action
The action to perform on a resource. Possible values of the action property are as follows:
* start - Start the resource.
* stop - Stop the resource.
* promote - Promote the resource from a slave resource to a master resource.
* demote - Demote the resource from a master resource to a slave resource.
If no action is specified, the default action is start. For information on master and slave resources, see Section 8.2, “Multi-State Resources: Resources That Have Multiple Modes”.
kind option
How to enforce the constraint. The possible values of the kind option are as follows:
* Optional - Only applies if both resources are starting and/or stopping. For information on optional ordering, see Section 6.2.2, “Advisory Ordering”.
* Mandatory - Always (default value). If the first resource you specified is stopping or cannot be started, the second resource you specified must be stopped. For information on mandatory ordering, see Section 6.2.1, “Mandatory Ordering”.
* Serialize - Ensure that no two stop/start actions occur concurrently for a set of resources.
symmetrical options
If true, which is the default, stop the resources in the reverse order. Default value: true

6.2.1. Mandatory Ordering

A mandatory constraints indicates that the second resource you specify cannot run without the first resource you specify being active. This is the default value of the kind option. Leaving the default value ensures that the second resource you specify will react when the first resource you specify changes state.
  • If the first resource you specified resource was running and is stopped, the second resource you specified will also be stopped (if it is running).
  • If the first resource you specified resource was not running and cannot be started, the second resource you specified will be stopped (if it is running).
  • If the first resource you specified is (re)started while the second resource you specified is running, the second resource you specified will be stopped and restarted.
Red Hat logoGithubredditYoutubeTwitter

자세한 정보

평가판, 구매 및 판매

커뮤니티

Red Hat 문서 정보

Red Hat을 사용하는 고객은 신뢰할 수 있는 콘텐츠가 포함된 제품과 서비스를 통해 혁신하고 목표를 달성할 수 있습니다. 최신 업데이트를 확인하세요.

보다 포괄적 수용을 위한 오픈 소스 용어 교체

Red Hat은 코드, 문서, 웹 속성에서 문제가 있는 언어를 교체하기 위해 최선을 다하고 있습니다. 자세한 내용은 다음을 참조하세요.Red Hat 블로그.

Red Hat 소개

Red Hat은 기업이 핵심 데이터 센터에서 네트워크 에지에 이르기까지 플랫폼과 환경 전반에서 더 쉽게 작업할 수 있도록 강화된 솔루션을 제공합니다.

Theme

© 2026 Red Hat
맨 위로 이동