2.6. Testing SAP HANA System Replication


The test phase is a very important phase to verify if the KPIs are met and the landscape performs the way it was configured. If the SAP HANA System Replication setup does not work as expected without the HA cluster, it can lead to unexpected behavior when the HA cluster is configured later on to manage the SAP HANA System Replication setup.

Therefore, a few test cases are suggested below as guidelines, which should be enhanced by your specific requirements. The tests should be performed with realistic data loads and sizes.

Expand
Test caseDescription

Full Replication

Measure how long the initial synchronization takes, from when

Lost Connection

Measure how long it takes until primary and secondary are

Takeover

Measure how long it takes for the secondary system to be fully

Data Consistency

Create or change data, then perform a takeover and check if the data is still available.

Client Reconnect

Test client access after a take-over, to check if the DNS/Virtual IP switch worked.

Primary becomes secondary

Measure how long it takes until both systems are in sync, when the former primary becomes the secondary after a takeover.

Please refer to section “9. Testing”, in How To Perform System Replication for SAP HANA, for more information.

Red Hat logoGithubredditYoutubeTwitter

자세한 정보

평가판, 구매 및 판매

커뮤니티

Red Hat 소개

Red Hat은 기업이 핵심 데이터 센터에서 네트워크 에지에 이르기까지 플랫폼과 환경 전반에서 더 쉽게 작업할 수 있도록 강화된 솔루션을 제공합니다.

보다 포괄적 수용을 위한 오픈 소스 용어 교체

Red Hat은 코드, 문서, 웹 속성에서 문제가 있는 언어를 교체하기 위해 최선을 다하고 있습니다. 자세한 내용은 다음을 참조하세요.Red Hat 블로그.

Red Hat 문서 정보

Legal Notice

Theme

© 2026 Red Hat
맨 위로 이동