此内容没有您所选择的语言版本。

Chapter 4. Migrating within a maintenance window


For environments where downtime is acceptable, follow this simpler sequential process.

Prerequisites

Perform a dry run migration in a staging environment to estimate the timing of the data export and import phases accurately. Once you are satisfied with the results, proceed with the production migration.

Procedure

  1. Stop all client applications that connect to Apicurio Registry 2.6.
  2. Export data from Apicurio Registry 2.6 using the export script. See Migration scripts reference.
  3. Shut down Apicurio Registry 2.6.
  4. Deploy Apicurio Registry 3.x with updated configuration. See Updating registry configuration.
  5. Import data into Apicurio Registry 3.x using the import script. See Migration scripts reference.
  6. Validate the import using the verification scripts. See Migration scripts reference.
  7. Update client application configurations to point to Apicurio Registry 3.x. See Migrating Apicurio Registry client applications.
  8. Start client applications.
Red Hat logoGithubredditYoutubeTwitter

学习

尝试、购买和销售

社区

关于红帽文档

通过我们的产品和服务,以及可以信赖的内容,帮助红帽用户创新并实现他们的目标。 了解我们当前的更新.

让开源更具包容性

红帽致力于替换我们的代码、文档和 Web 属性中存在问题的语言。欲了解更多详情,请参阅红帽博客.

關於紅帽

我们提供强化的解决方案,使企业能够更轻松地跨平台和环境(从核心数据中心到网络边缘)工作。

Theme

© 2026 Red Hat
返回顶部