此内容没有您所选择的语言版本。

Preface


As a system administrator or business rules developer, you can migrate your existing project data in Red Hat JBoss BRMS 6.4 to Red Hat Decision Manager 7.1. Red Hat provides migration tools wherever possible to facilitate migration, but in some cases, manual migration or asset re-creation may be required.

Prerequisites

  • Red Hat JBoss BRMS 6.4 is installed and contains artifacts that you want to migrate to Red Hat Decision Manager 7.1.
  • A clean Red Hat Decision Manager 7.1 installation exists that does not contain a .niogit folder. If the Red Hat Decision Manager 7.1 installation contains a .niogit folder, the migration will fail. For installation options, see Planning a Red Hat Decision Manager installation.
Important

If you have already migrated to Red Hat Decision Manager 7.0 and you want to migrate to Red Hat Decision Manager 7.1, follow the migration instructions in Migrating from Red Hat Decision Manager 7.0 to Red Hat Decision Manager 7.1.

Red Hat logoGithubredditYoutubeTwitter

学习

尝试、购买和销售

社区

关于红帽文档

通过我们的产品和服务,以及可以信赖的内容,帮助红帽用户创新并实现他们的目标。 了解我们当前的更新.

让开源更具包容性

红帽致力于替换我们的代码、文档和 Web 属性中存在问题的语言。欲了解更多详情,请参阅红帽博客.

關於紅帽

我们提供强化的解决方案,使企业能够更轻松地跨平台和环境(从核心数据中心到网络边缘)工作。

Theme

© 2026 Red Hat
返回顶部