このコンテンツは選択した言語では利用できません。

14.2. Rolling Upgrades Using REST


The following procedure outlines using Red Hat JBoss Data Grid installations as a remote grid using the REST protocol. This procedure applies to rolling upgrades for the grid, not the client application.

Procedure 14.1. Perform Rolling Upgrades Using REST

In the instructions, the Source Cluster refers to the old cluster that is currently in use and the Target Cluster refers to the destination cluster for our data.
  1. Configure the Target Cluster

    Use either different network settings or a different JGroups cluster name to set the Target Cluster (consisting of nodes with new JBoss Data Grid) apart from the Source Cluster. For each cache, configure a RestCacheStore with the following settings:
    1. Ensure that the host and port values point to the Source Cluster.
    2. Ensure that the path value points to the Source Cluster's REST endpoint.
  2. Start the Target Cluster

    Start the Target Cluster's nodes. Configure each client to point to the Target Cluster instead of the Source Cluster. Eventually, the Target Cluster handles all requests instead of the Source Cluster. The Target Cluster then lazily loads data from the Source Cluster on demand using the RestCacheStore.
  3. Do not dump the Key Set during REST Rolling Upgrades

    The REST Rolling Upgrades use case is designed to fetch all the data from the Source Cluster without using the recordKnownGlobalKeyset operation.

    Warning

    Do not invoke the recordKnownGlobalKeyset operation for REST Rolling Upgrades. If you invoke this operation, it will cause data corruption and REST Rolling Upgrades will not complete successfully.
  4. Fetch the Remaining Data

    The Target Cluster must fetch all the remaining data from the Source Cluster. This is done either using JMX or the CLI as follows:
    1. Using JMX

      Invoke the synchronizeData operation with the rest parameter specified on the RollingUpgradeManager MBean on the Target Cluster for all caches to be migrated.
    2. Using the CLI

      Run the upgrade --synchronize=rest on the Target Cluster for all caches to be migrated. Optionally, use the --all switch to synchronize all caches in the cluster.
  5. Disable the RestCacheStore

    Disable the RestCacheStore on the Target Cluster using either JMX or the CLI as follows:
    1. Using JMX

      Invoke the disconnectSource operation with the rest parameter specified on the RollingUpgradeManager MBean on the Target Cluster.
    2. Using the CLI

      Run the upgrade --disconnectsource=rest command on the Target Cluster. Optionally, use the --all switch to disconnect all caches in the cluster.
Result

Migration to the Target Cluster is complete. The Source Cluster can now be decommissioned.

Red Hat logoGithubRedditYoutubeTwitter

詳細情報

試用、購入および販売

コミュニティー

Red Hat ドキュメントについて

Red Hat をお使いのお客様が、信頼できるコンテンツが含まれている製品やサービスを活用することで、イノベーションを行い、目標を達成できるようにします。

多様性を受け入れるオープンソースの強化

Red Hat では、コード、ドキュメント、Web プロパティーにおける配慮に欠ける用語の置き換えに取り組んでいます。このような変更は、段階的に実施される予定です。詳細情報: Red Hat ブログ.

会社概要

Red Hat は、企業がコアとなるデータセンターからネットワークエッジに至るまで、各種プラットフォームや環境全体で作業を簡素化できるように、強化されたソリューションを提供しています。

© 2024 Red Hat, Inc.