이 콘텐츠는 선택한 언어로 제공되지 않습니다.

6.4. Testing Before Upgrading the IdM Server (Recommended)


It can be beneficial, and safer, to test newer versions of Identity Management before upgrading production systems. There is a relatively simple way to do this by creating a sacrificial replica and testing on that system.
  1. Set up a replica based on one of the production servers, with the same version of IdM as is running in production, as described in Chapter 4, Setting up IdM Replicas. For this example, this is called Test Replica. Make sure that Test Replica can successfully connect to the production server and domain.
  2. After verifying that Test Replica has been successfully added to the production domain, disconnect Test Replica from the network.
  3. Remove the replication agreements for Test Replica from the original IdM server and from Test Replica.
  4. Reconnect Test Replica to the network.
  5. Upgrade the packages on Test Replica using yum or whatever package update tool is appropriate for your system. For example:
    [root@ipareplica ~]# yum update ipa*
  6. Test common things on Test Replica, like getting Kerberos credentials, opening the server UI, and running commands.
Red Hat logoGithubRedditYoutubeTwitter

자세한 정보

평가판, 구매 및 판매

커뮤니티

Red Hat 문서 정보

Red Hat을 사용하는 고객은 신뢰할 수 있는 콘텐츠가 포함된 제품과 서비스를 통해 혁신하고 목표를 달성할 수 있습니다.

보다 포괄적 수용을 위한 오픈 소스 용어 교체

Red Hat은 코드, 문서, 웹 속성에서 문제가 있는 언어를 교체하기 위해 최선을 다하고 있습니다. 자세한 내용은 다음을 참조하세요.Red Hat 블로그.

Red Hat 소개

Red Hat은 기업이 핵심 데이터 센터에서 네트워크 에지에 이르기까지 플랫폼과 환경 전반에서 더 쉽게 작업할 수 있도록 강화된 솔루션을 제공합니다.

© 2024 Red Hat, Inc.