Chapter 2. BPEL and SwitchYard
2.1. Introduction 링크 복사링크가 클립보드에 복사되었습니다!
링크 복사링크가 클립보드에 복사되었습니다!
The BPEL Component is a pluggable container in SwitchYard that allows you to expose a WS-BPEL business process as a service through an interface defined using WSDL.
Important
BPEL (based on the Riftsaw project) is no longer being actively developed and will be removed from a future release of JBoss Fuse. If you are currently using BPEL, it is recommended that you consider migrating to the Red Hat JBoss BPM Suite (which is supported through the JBoss Fuse Integration Package).