Fuse 6 is no longer supported
As of February 2025, Red Hat Fuse 6 is no longer supported. If you are using Fuse 6, please upgrade to Red Hat build of Apache Camel.이 콘텐츠는 선택한 언어로 제공되지 않습니다.
3.2. Offline Maven Repositories in Red Hat JBoss Fuse 7
The current delivery mechanism of the offline Maven repositories is expected to change in the next major release, Red Hat JBoss Fuse 7. The planned change is to no longer ship the repositories as downloadable ZIP files, but to provide a script that will download all required artifacts from an online repository.