이 콘텐츠는 선택한 언어로 제공되지 않습니다.

Chapter 9. Upgrading from Red Hat Gluster Storage 3.2 to Red Hat Gluster Storage 3.3 in a Red Hat Enterprise Virtualization-Red Hat Gluster Storage Environment


This section describes the upgrade methods for a Red Hat Gluster Storage and Red Hat Enterprise Virtualization integrated environment. You can upgrade Red Hat Gluster Storage 3.2 to Red Hat Gluster Storage 3.3 using an ISO or yum.

Warning

Before you upgrade, be aware of changed requirements that exist after Red Hat Gluster Storage 3.1.3. If you want to access a volume being provided by a Red Hat Gluster Storage 3.1.3 or higher server, your client must also be using Red Hat Gluster Storage 3.1.3 or higher. Accessing volumes from other client versions can result in data becoming unavailable and problems with directory operations. This requirement exists because Red Hat Gluster Storage 3.1.3 contained a number of changes that affect how the Distributed Hash Table works in order to improve directory consistency and remove the effects seen in BZ#1115367 and BZ#1118762.

Important

In Red Hat Enterprise Linux 7 based Red Hat Gluster Storage, updating to 3.1 or higher reloads firewall rules. All runtime-only changes made before the reload are lost.

9.1. Upgrading using an ISO

  1. Using Red Hat Enterprise Virtualization Manager, stop all the virtual machine instances.
    The Red Hat Gluster Storage volume on the instances will be stopped during the upgrade.
  2. Using Red Hat Enterprise Virtualization Manager, move the data domain of the data center to Maintenance mode.
  3. Using Red Hat Enterprise Virtualization Manager, stop the volume (the volume used for data domain) containing Red Hat Gluster Storage nodes in the data center.
  4. Using Red Hat Enterprise Virtualization Manager, move all Red Hat Gluster Storage nodes to Maintenance mode.
  5. Perform the ISO Upgrade as mentioned in section Section 8.2.1.3, “Configuring repo for Upgrading using ISO”.
  6. Re-install the Red Hat Gluster Storage nodes from Red Hat Enterprise Virtualization Manager.

    Note

    • Re-installation for the Red Hat Gluster Storage nodes should be done from Red Hat Enterprise Virtualization Manager. The newly upgraded Red Hat Gluster Storage 3.3 nodes lose their network configuration and other configuration details, such as firewall configuration, which was done while adding the nodes to Red Hat Enterprise Virtualization Manager. Re-install the Red Hat Gluster Storage nodes to have the bootstrapping done.
    • You can re-configure the Red Hat Gluster Storage nodes using the option provided under Action Items, as shown in Figure 9.1, “Red Hat Gluster Storage Node before Upgrade ”, and perform bootstrapping.

    Figure 9.1. Red Hat Gluster Storage Node before Upgrade

  7. Perform the steps above in all Red Hat Gluster Storage nodes.
  8. Start the volume once all the nodes are shown in Up status in Red Hat Enterprise Virtualization Manager.
  9. Upgrade the native client bits for Red Hat Enterprise Linux 6 or Red Hat Enterprise Linux 7, depending on the hypervisor you are using.

    Note

    If Red Hat Enterprise Virtualization Hypervisor is used as hypervisor, then install a suitable build of Red Hat Enterprise Virtualization Hypervisor containing the latest native client.

    Figure 9.2. Red Hat Gluster Storage Node after Upgrade

  10. Using Red Hat Enterprise Virtualization Manager, activate the data domain and start all the virtual machine instances in the data center.
맨 위로 이동
Red Hat logoGithubredditYoutubeTwitter

자세한 정보

평가판, 구매 및 판매

커뮤니티

Red Hat 문서 정보

Red Hat을 사용하는 고객은 신뢰할 수 있는 콘텐츠가 포함된 제품과 서비스를 통해 혁신하고 목표를 달성할 수 있습니다. 최신 업데이트를 확인하세요.

보다 포괄적 수용을 위한 오픈 소스 용어 교체

Red Hat은 코드, 문서, 웹 속성에서 문제가 있는 언어를 교체하기 위해 최선을 다하고 있습니다. 자세한 내용은 다음을 참조하세요.Red Hat 블로그.

Red Hat 소개

Red Hat은 기업이 핵심 데이터 센터에서 네트워크 에지에 이르기까지 플랫폼과 환경 전반에서 더 쉽게 작업할 수 있도록 강화된 솔루션을 제공합니다.

Theme

© 2025 Red Hat