16. Operations


Q: I clicked the Operations tab, but I don't see any available operations, and it says "No items to show." How do I schedule an operation?
Q:
I clicked the Operations tab, but I don't see any available operations, and it says "No items to show." How do I schedule an operation?
A:
The Schedules tab shows a list of scheduled operations, meaning operations which are configured but have not yet been run. If there are no scheduled operations, then the tab has a description that reads No items to show.
That does not mean that there are no operations available for the resource; it only means that no operations have been scheduled.
To schedule an operation, click the New in the lower left corner of the Operations tab, and fill in the operation information.
返回顶部
Red Hat logoGithubredditYoutubeTwitter

学习

尝试、购买和销售

社区

关于红帽文档

通过我们的产品和服务,以及可以信赖的内容,帮助红帽用户创新并实现他们的目标。 了解我们当前的更新.

让开源更具包容性

红帽致力于替换我们的代码、文档和 Web 属性中存在问题的语言。欲了解更多详情,请参阅红帽博客.

關於紅帽

我们提供强化的解决方案,使企业能够更轻松地跨平台和环境(从核心数据中心到网络边缘)工作。

Theme

© 2025 Red Hat