此内容没有您所选择的语言版本。

Chapter 5. Running the upgrade to Red Hat Quay v3.0.z


Choose between a synchronous upgrade (complete the upgrade in downtime) and a background upgrade (complete the upgrade while Red Hat Quay is still running). Both of these major-release upgrades require that the Red Hat Quay cluster be down for at least a short period of time.

Regardless of which upgrade type you choose, during the time that the Red Hat Quay cluster is down, if you are using builder and clair images, you need to also upgrade to those new images:

  • The builder image (quay.io/redhat/quay-builder:v3.0.5)
  • The clair image (quay.io/redhat/clair-jwt:v3.0.5)

Both of those images are available from the quay.io/redhat repository.

5.1. Run a synchronous upgrade

To run a synchronous upgrade, where your whole cluster is down for the entire upgrade, do the following:

  1. Take down your entire Red Hat Quay cluster, including any quay-builder and clair containers.
  2. Add the following setting to the config.yaml file on all nodes:

    V3_UPGRADE_MODE: complete

  3. Pull and start up the v3 container on a single node and wait for however long it takes to do the upgrade (it should take just a few minutes). Use the following container or later:

    quay.io/redhat/quay:v3.0.5

    Note that the quay container comes up on ports 8080 and 8443 for v3, instead of 80 and 443, as they did for v2. Therefore, we recommend remapping 8080 and 8443 into 80 and 443, respectively, as shown in this example:

    # docker run --restart=always -p 443:8443 -p 80:8080 \
       --sysctl net.core.somaxconn=4096 \
       --privileged=true \
       -v /mnt/quay/config:/conf/stack:Z \
       -v /mnt/quay/storage:/datastorage:Z \
       -d quay.io/redhat/quay:v3.0.5
    Copy to Clipboard Toggle word wrap
  4. After the upgrade completes, bring the Red Hat Quay v3 container up on all other nodes.
  5. Start v3.0.z versions of quay-builder and clair to replace any instances of those containers you want to return to your cluster.
  6. Verify that Red Hat Quay is working, including pushes and pulls of containers compatible with Docker version 2, schema 2. This can include windows container images and images of different computer architectures (arm, ppc, etc.).

5.2. Run a background upgrade

To run a background upgrade, you need only bring down your cluster for a short period of time on two occasions. When you bring the cluster back up after the first downtime, the quay v3 container runs in v2 compatibility mode as it backfills the database. This background process can take hours or even days to complete. Background upgrades are recommended for large installations where downtime of more than a few hours would be a problem.

For this type of upgrade, you put Red Hat Quay into a compatibility mode, where you have a v3 quay container running, but it is running on the old data model while the upgrade completes. Here’s what you do:

  1. Pull the Red Hat Quay v3 container to all the nodes. Use the following container or later:

    quay.io/redhat/quay:v3.0.5

  2. Take down your entire Red Hat Quay cluster, including any quay-builder and clair containers.
  3. Edit the config.yaml file on each node and set the upgrade mode to background as follows:

    V3_UPGRADE_MODE: background

  4. Bring the Red Hat Quay v3 container up on a single node and wait for the migrations to complete (should take a few minutes maximum). Here is an example of that command:

    Note that the quay container comes up on ports 8080 and 8443 for v3, instead of 80 and 443, as they did for v2. Therefore, we recommend remapping 8080 and 8443 into 80 and 443, respectively, as shown in this example:

    # docker run --restart=always -p 443:8443 -p 80:8080 \
       --sysctl net.core.somaxconn=4096 \
       --privileged=true \
       -v /mnt/quay/config:/conf/stack:Z \
       -v /mnt/quay/storage:/datastorage:Z \
       -d quay.io/redhat/quay:v3.0.5
    Copy to Clipboard Toggle word wrap
  5. Bring the Red Hat Quay v3 container up on all the other nodes.
  6. Monitor the /upgradeprogress API endpoint until it reports done enough to move to the next step (the status reaches 99%). For example, view https://myquay.example.com/upgradeprogress or use some other tool to query the API.
  7. Once the background process is far enough along you have to schedule another maintenance window.
  8. During your scheduled maintenance, take the entire Red Hat Quay cluster down.
  9. Edit the config.yaml file on each node and set the upgrade mode to complete as follows:

    V3_UPGRADE_MODE: complete

  10. Bring Red Hat Quay back up on one node to have it do a final check.
  11. Once the final check is done, bring Red Hat Quay v3 back up on all the other nodes.
  12. Start v3.0.z versions of quay-builder and clair to replace any instances of those containers you want to return to your cluster.
  13. Verify Quay is working, including pushes and pulls of containers compatible with Docker version 2, schema 2. This can include windows container images and images of different computer architectures (arm, ppc, etc.).
返回顶部
Red Hat logoGithubredditYoutubeTwitter

学习

尝试、购买和销售

社区

关于红帽文档

通过我们的产品和服务,以及可以信赖的内容,帮助红帽用户创新并实现他们的目标。 了解我们当前的更新.

让开源更具包容性

红帽致力于替换我们的代码、文档和 Web 属性中存在问题的语言。欲了解更多详情,请参阅红帽博客.

關於紅帽

我们提供强化的解决方案,使企业能够更轻松地跨平台和环境(从核心数据中心到网络边缘)工作。

Theme

© 2025 Red Hat