Dieser Inhalt ist in der von Ihnen ausgewählten Sprache nicht verfügbar.

36.2. Rolling Upgrades Using REST


The following procedure outlines using Red Hat JBoss Data Grid installations as a remote grid using the REST protocol. This procedure applies to rolling upgrades for the grid, not the client application.

Procedure 36.1. Perform Rolling Upgrades Using REST

In the instructions, the Source Cluster refers to the old cluster that is currently in use and the Target Cluster refers to the destination cluster for our data.
  1. Configure the Target Cluster

    Use either different network settings or a different JGroups cluster name to set the Target Cluster (consisting of nodes with new JBoss Data Grid) apart from the Source Cluster. For each cache, configure a RestCacheStore with the following settings:
    1. Ensure that the host and port values point to the Source Cluster.
    2. Ensure that the path value points to the Source Cluster's REST endpoint.
  2. Start the Target Cluster

    Start the Target Cluster's nodes. Configure each client to point to the Target Cluster instead of the Source Cluster. Eventually, the Target Cluster handles all requests instead of the Source Cluster. The Target Cluster then lazily loads data from the Source Cluster on demand using the RestCacheStore.
  3. Do not dump the Key Set during REST Rolling Upgrades

    The REST Rolling Upgrades use case is designed to fetch all the data from the Source Cluster without using the recordKnownGlobalKeyset operation.

    Warning

    Do not invoke the recordKnownGlobalKeyset operation for REST Rolling Upgrades. If you invoke this operation, it will cause data corruption and REST Rolling Upgrades will not complete successfully.
  4. Fetch the Remaining Data

    The Target Cluster must fetch all the remaining data from the Source Cluster. This is done either using JMX or the CLI as follows:
    1. Using JMX

      Invoke the synchronizeData operation with the rest parameter specified on the RollingUpgradeManager MBean on the Target Cluster for all caches to be migrated.
    2. Using the CLI

      Run the upgrade --synchronize=rest on the Target Cluster for all caches to be migrated. Optionally, use the --all switch to synchronize all caches in the cluster.
  5. Disable the RestCacheStore

    Disable the RestCacheStore on the Target Cluster using either JMX or the CLI as follows:
    1. Using JMX

      Invoke the disconnectSource operation with the rest parameter specified on the RollingUpgradeManager MBean on the Target Cluster.
    2. Using the CLI

      Run the upgrade --disconnectsource=rest command on the Target Cluster. Optionally, use the --all switch to disconnect all caches in the cluster.
Result

Migration to the Target Cluster is complete. The Source Cluster can now be decommissioned.

Nach oben
Red Hat logoGithubredditYoutubeTwitter

Lernen

Testen, kaufen und verkaufen

Communitys

Über Red Hat Dokumentation

Wir helfen Red Hat Benutzern, mit unseren Produkten und Diensten innovativ zu sein und ihre Ziele zu erreichen – mit Inhalten, denen sie vertrauen können. Entdecken Sie unsere neuesten Updates.

Mehr Inklusion in Open Source

Red Hat hat sich verpflichtet, problematische Sprache in unserem Code, unserer Dokumentation und unseren Web-Eigenschaften zu ersetzen. Weitere Einzelheiten finden Sie in Red Hat Blog.

Über Red Hat

Wir liefern gehärtete Lösungen, die es Unternehmen leichter machen, plattform- und umgebungsübergreifend zu arbeiten, vom zentralen Rechenzentrum bis zum Netzwerkrand.

Theme

© 2025 Red Hat