Dieser Inhalt ist in der von Ihnen ausgewählten Sprache nicht verfügbar.

18.8. Changing the Availability Check Interval


While the availability check is not strictly a metric, it does have a collection schedule that can be edited with the other metric collection schedules.
  1. Click the Inventory tab in the top menu.
  2. Select the resource category, such as servers or services, in the Resources menu table on the left. Then browse or search for the resource.
  3. Click the Monitoring tab on the resource entry.
  4. Click the Schedules subtab.
  5. Select the availability metric, and enter the desired collection period in the Collection Interval field, with the appropriate time unit (seconds, minutes, or hours).
    Note
    Availability schedules can be set on compatible groups or resource type templates. Setting it at the group or resource type level changes multiple resources simultaneously.
  6. Click Set.
Nach oben
Red Hat logoGithubredditYoutubeTwitter

Lernen

Testen, kaufen und verkaufen

Communitys

Über Red Hat Dokumentation

Wir helfen Red Hat Benutzern, mit unseren Produkten und Diensten innovativ zu sein und ihre Ziele zu erreichen – mit Inhalten, denen sie vertrauen können. Entdecken Sie unsere neuesten Updates.

Mehr Inklusion in Open Source

Red Hat hat sich verpflichtet, problematische Sprache in unserem Code, unserer Dokumentation und unseren Web-Eigenschaften zu ersetzen. Weitere Einzelheiten finden Sie in Red Hat Blog.

Über Red Hat

Wir liefern gehärtete Lösungen, die es Unternehmen leichter machen, plattform- und umgebungsübergreifend zu arbeiten, vom zentralen Rechenzentrum bis zum Netzwerkrand.

Theme

© 2025 Red Hat