Buscar

Este contenido no está disponible en el idioma seleccionado.

8.4. Migrating NIS Domains to IdM

download PDF
If you are managing a Linux environment and want to migrate disparate NIS domains with different UIDs and GIDs into a modern identity management solution, you can use ID views to set host specific UIDs and GIDs for existing hosts to prevent changing the permissions on existing files and directories.
The process for the migration follows these steps:
  1. Create the users and groups in the IdM domain. For details, see
  2. Use ID views for existing hosts to override the IDs IdM generated during the user creation:
    1. Create an individual ID view.
    2. Add ID overrides for the users and groups to the ID view.
    3. Assign the ID view to the specific hosts.
  3. Installing and Uninstalling Identity Management Clients in the Linux Domain Identity, Authentication, and Policy Guide.
  4. Decommission the NIS domains.
Red Hat logoGithubRedditYoutubeTwitter

Aprender

Pruebe, compre y venda

Comunidades

Acerca de la documentación de Red Hat

Ayudamos a los usuarios de Red Hat a innovar y alcanzar sus objetivos con nuestros productos y servicios con contenido en el que pueden confiar.

Hacer que el código abierto sea más inclusivo

Red Hat se compromete a reemplazar el lenguaje problemático en nuestro código, documentación y propiedades web. Para más detalles, consulte el Blog de Red Hat.

Acerca de Red Hat

Ofrecemos soluciones reforzadas que facilitan a las empresas trabajar en plataformas y entornos, desde el centro de datos central hasta el perímetro de la red.

© 2024 Red Hat, Inc.