Ce contenu n'est pas disponible dans la langue sélectionnée.

18.8. Changing the Availability Check Interval


While the availability check is not strictly a metric, it does have a collection schedule that can be edited with the other metric collection schedules.
  1. Click the Inventory tab in the top menu.
  2. Select the resource category, such as servers or services, in the Resources menu table on the left. Then browse or search for the resource.
  3. Click the Monitoring tab on the resource entry.
  4. Click the Schedules subtab.
  5. Select the availability metric, and enter the desired collection period in the Collection Interval field, with the appropriate time unit (seconds, minutes, or hours).
    Note
    Availability schedules can be set on compatible groups or resource type templates. Setting it at the group or resource type level changes multiple resources simultaneously.
  6. Click Set.
Red Hat logoGithubRedditYoutubeTwitter

Apprendre

Essayez, achetez et vendez

Communautés

À propos de la documentation Red Hat

Nous aidons les utilisateurs de Red Hat à innover et à atteindre leurs objectifs grâce à nos produits et services avec un contenu auquel ils peuvent faire confiance.

Rendre l’open source plus inclusif

Red Hat s'engage à remplacer le langage problématique dans notre code, notre documentation et nos propriétés Web. Pour plus de détails, consultez leBlog Red Hat.

À propos de Red Hat

Nous proposons des solutions renforcées qui facilitent le travail des entreprises sur plusieurs plates-formes et environnements, du centre de données central à la périphérie du réseau.

© 2024 Red Hat, Inc.