このコンテンツは選択した言語では利用できません。

7.8. Rebalancing Volume


Storage volumes are abstracted from hardware, allowing each to be managed independently. Storage can be added or removed from the storage pools while data continues to be available, with no application interruption. Volumes can be expanded or shrunk across machines by adding or removing bricks.
After expanding or shrinking a volume (without migrating data), you need to rebalance the data among the hosts. In a non-replicated volume, all bricks should be online to perform the rebalance operation. In a replicated volume, at least one of the bricks in the replica should be online.
Through Red Hat Gluster Storage Console, you can perform the following:
  • Start Rebalance
  • Stop Rebalance
  • View Rebalance Status

Note

You can monitor the status of Rebalance operation from the Tasks pane.

7.8.1. Start Rebalance

  1. Click the Volumes tab. The Volumes tab is displayed with the list of all volumes in the system.
  2. Select the volume that you want to Rebalance.
  3. Click the Rebalance. The Rebalance process starts and the rebalance icon is displayed in the Activities column of the volume. A mouseover script is displayed mentioning that the rebalance is in progress. You can view the rebalance status by selecting status from the rebalance drop-down list .

    Note

    After completion of the rebalance operation, the rebalance icon disappears after 10 minutes.

7.8.2. Stop Rebalance

  1. Click the Volumes tab. The Volumes tab is displayed with the list of all volumes in the system.
  2. Select a volume on which Rebalance need to be stopped.

    Note

    • You can not stop rebalance for multiple volumes.
    • Rebalance can be stopped for volumes only if it is in progress
  3. In the Activities column, select the drop-down of the Rebalance icon corresponding to the volume.
  4. Click Stop. The Stop Rebalance window is displayed.
  5. Click OK to stop rebalance. The Rebalance is stopped and the status window is displayed.
    You can also check the status of the Rebalance operation by selecting Status option from the drop down of Rebalance icon in the activities column.

7.8.3. View Rebalance Status

  1. Click the Volumes tab. The Volumes tab is displayed with the list of all volumes in the system.
  2. Select the volume on which Rebalance is in progress, stopped, completed.
  3. Click Status option from the Rebalance icon drop down list. The Rebalance Status page is displayed.
    Rebalance Status

    Figure 7.9. Rebalance Status

    Note

    If the Rebalance Status window is open while Rebalance is stopped using the CLI, the status is displayed as Stopped. If the Rebalance Status window is not open, the task status is displayed as Unknown as the status update depends on gluster CLI.
    You can also stop Rebalance operation by clicking Stop in the Rebalance Status window.
Red Hat logoGithubRedditYoutubeTwitter

詳細情報

試用、購入および販売

コミュニティー

Red Hat ドキュメントについて

Red Hat をお使いのお客様が、信頼できるコンテンツが含まれている製品やサービスを活用することで、イノベーションを行い、目標を達成できるようにします。

多様性を受け入れるオープンソースの強化

Red Hat では、コード、ドキュメント、Web プロパティーにおける配慮に欠ける用語の置き換えに取り組んでいます。このような変更は、段階的に実施される予定です。詳細情報: Red Hat ブログ.