40.3. Split Brain Timing: Recovering From a Split


After a split occurs JBoss Data Grid will merge the partitions back, and the maximum time to detect a merge after the network partition is healed is:
3.1 * MERGE3.max_interval
Copy to Clipboard Toggle word wrap
In some cases multiple merges will occur after a split so that the cluster may contain all available partitions. In this case, where multiple merges occur, time should be allowed for all of these to complete, and as there may be as many as three merges occurring sequentially the total delay should be no more than the following:
10 * MERGE3.max_interval
Copy to Clipboard Toggle word wrap

Important

The amount of time taken in the formulas above is how long it takes JBoss Data Grid to install a cluster view without the leavers; however, as JBoss Data Grid runs inside a JVM excessive Garbage Collection (GC) times can increase this time beyond the failure detection outlined above. JBoss Data Grid has no control over these GC times, and excessive GC on the coordinator can delay this detection by an amount equal to the GC time.
In addition, when merging cluster views JBoss Data Grid tries to confirm all members are present; however, there is no upper bound on waiting for these responses, and merging the cluster views may be delayed due to networking issues.
返回顶部
Red Hat logoGithubredditYoutubeTwitter

学习

尝试、购买和销售

社区

关于红帽文档

通过我们的产品和服务,以及可以信赖的内容,帮助红帽用户创新并实现他们的目标。 了解我们当前的更新.

让开源更具包容性

红帽致力于替换我们的代码、文档和 Web 属性中存在问题的语言。欲了解更多详情,请参阅红帽博客.

關於紅帽

我们提供强化的解决方案,使企业能够更轻松地跨平台和环境(从核心数据中心到网络边缘)工作。

Theme

© 2025 Red Hat