此内容没有您所选择的语言版本。

9.8.2. Running a Maintenance Operation


JBoss ON regularly takes snapshots or backups of its monitoring and system data. This occurs for two events:
  • When a node is added or removed from the cluster.
  • As part of weekly maintenance.
    The weekly maintanenace snapshot is scheduled for Sunday at 00:30. The schedule is fixed and cannot be changed.
A maintenance operation has two parts:
  1. Take a snapshot of every node in the cluster.
  2. Run a repair operation on every node. The repair operation is run on each node consecutively, to update and resolve any data issues.
It is possible to initiate a maintenance operation outside its schedule through the JBoss ON command-line tool:
rhqadmin@localhost:7080$ StorageNodeManager.runClusterMaintenance()

Note

The node repair operation is CPU- and disk-intensive. Running the maintenance operation during high-use times will result in performance degradation.
Red Hat logoGithubredditYoutubeTwitter

学习

尝试、购买和销售

社区

关于红帽文档

通过我们的产品和服务,以及可以信赖的内容,帮助红帽用户创新并实现他们的目标。 了解我们当前的更新.

让开源更具包容性

红帽致力于替换我们的代码、文档和 Web 属性中存在问题的语言。欲了解更多详情,请参阅红帽博客.

關於紅帽

我们提供强化的解决方案,使企业能够更轻松地跨平台和环境(从核心数据中心到网络边缘)工作。

Theme

© 2026 Red Hat
返回顶部