検索

このコンテンツは選択した言語では利用できません。

18.8. Changing the Availability Check Interval

download PDF
While the availability check is not strictly a metric, it does have a collection schedule that can be edited with the other metric collection schedules.
  1. Click the Inventory tab in the top menu.
  2. Select the resource category, such as servers or services, in the Resources menu table on the left. Then browse or search for the resource.
  3. Click the Monitoring tab on the resource entry.
  4. Click the Schedules subtab.
  5. Select the availability metric, and enter the desired collection period in the Collection Interval field, with the appropriate time unit (seconds, minutes, or hours).

    Note

    Availability schedules can be set on compatible groups or resource type templates. Setting it at the group or resource type level changes multiple resources simultaneously.
  6. Click Set.
Red Hat logoGithubRedditYoutubeTwitter

詳細情報

試用、購入および販売

コミュニティー

Red Hat ドキュメントについて

Red Hat をお使いのお客様が、信頼できるコンテンツが含まれている製品やサービスを活用することで、イノベーションを行い、目標を達成できるようにします。

多様性を受け入れるオープンソースの強化

Red Hat では、コード、ドキュメント、Web プロパティーにおける配慮に欠ける用語の置き換えに取り組んでいます。このような変更は、段階的に実施される予定です。詳細情報: Red Hat ブログ.

会社概要

Red Hat は、企業がコアとなるデータセンターからネットワークエッジに至るまで、各種プラットフォームや環境全体で作業を簡素化できるように、強化されたソリューションを提供しています。

© 2024 Red Hat, Inc.