此内容没有您所选择的语言版本。

6.4. Testing Before Upgrading the IdM Server (Recommended)


It can be beneficial, and safer, to test newer versions of Identity Management before upgrading production systems. There is a relatively simple way to do this by creating a sacrificial replica and testing on that system.
  1. Set up a replica based on one of the production servers, with the same version of IdM as is running in production, as described in Chapter 4, Setting up IdM Replicas. For this example, this is called Test Replica. Make sure that Test Replica can successfully connect to the production server and domain.
  2. After verifying that Test Replica has been successfully added to the production domain, disconnect Test Replica from the network.
  3. Remove the replication agreements for Test Replica from the original IdM server and from Test Replica.
  4. Reconnect Test Replica to the network.
  5. Upgrade the packages on Test Replica using yum or whatever package update tool is appropriate for your system. For example:
    [root@ipareplica ~]# yum update ipa*
  6. Test common things on Test Replica, like getting Kerberos credentials, opening the server UI, and running commands.
Red Hat logoGithubRedditYoutubeTwitter

学习

尝试、购买和销售

社区

关于红帽文档

通过我们的产品和服务,以及可以信赖的内容,帮助红帽用户创新并实现他们的目标。

让开源更具包容性

红帽致力于替换我们的代码、文档和 Web 属性中存在问题的语言。欲了解更多详情,请参阅红帽博客.

關於紅帽

我们提供强化的解决方案,使企业能够更轻松地跨平台和环境(从核心数据中心到网络边缘)工作。

© 2024 Red Hat, Inc.