7.2.3. 以 pod 中作业的方式运行集群容量工具


若以 pod 中作业的方式运行集群容量工具,其优点是可以在无需用户干预的前提下多次运行。以作业方式运行集群容量工具涉及使用 ConfigMap 对象。

先决条件

下载并安装 集群容量工具

流程

运行集群容量工具:

  1. 创建集群角色:

    Copy to Clipboard Toggle word wrap
    $ cat << EOF| oc create -f -

    输出示例

    Copy to Clipboard Toggle word wrap
    kind: ClusterRole
    apiVersion: rbac.authorization.k8s.io/v1
    metadata:
      name: cluster-capacity-role
    rules:
    - apiGroups: [""]
      resources: ["pods", "nodes", "persistentvolumeclaims", "persistentvolumes", "services", "replicationcontrollers"]
      verbs: ["get", "watch", "list"]
    - apiGroups: ["apps"]
      resources: ["replicasets", "statefulsets"]
      verbs: ["get", "watch", "list"]
    - apiGroups: ["policy"]
      resources: ["poddisruptionbudgets"]
      verbs: ["get", "watch", "list"]
    - apiGroups: ["storage.k8s.io"]
      resources: ["storageclasses"]
      verbs: ["get", "watch", "list"]
    EOF

  2. 创建服务帐户:

    Copy to Clipboard Toggle word wrap
    $ oc create sa cluster-capacity-sa
  3. 将角色添加到服务帐户:

    Copy to Clipboard Toggle word wrap
    $ oc adm policy add-cluster-role-to-user cluster-capacity-role \
        system:serviceaccount:default:cluster-capacity-sa
  4. 定义并创建 Pod 规格:

    Copy to Clipboard Toggle word wrap
    apiVersion: v1
    kind: Pod
    metadata:
      name: small-pod
      labels:
        app: guestbook
        tier: frontend
    spec:
      containers:
      - name: php-redis
        image: gcr.io/google-samples/gb-frontend:v4
        imagePullPolicy: Always
        resources:
          limits:
            cpu: 150m
            memory: 100Mi
          requests:
            cpu: 150m
            memory: 100Mi
  5. 集群容量分析使用名为 cluster-capacity-configmapConfigMap 对象挂载到卷中,从而将输入 pod 规格文件 pod.yaml 挂载到卷 test-volume 的路径 /test-pod 上。

    如果还没有创建 ConfigMap 对象,请在创建作业前创建:

    Copy to Clipboard Toggle word wrap
    $ oc create configmap cluster-capacity-configmap \
        --from-file=pod.yaml=pod.yaml
  6. 使用以下作业规格文件示例创建作业:

    Copy to Clipboard Toggle word wrap
    apiVersion: batch/v1
    kind: Job
    metadata:
      name: cluster-capacity-job
    spec:
      parallelism: 1
      completions: 1
      template:
        metadata:
          name: cluster-capacity-pod
        spec:
            containers:
            - name: cluster-capacity
              image: openshift/origin-cluster-capacity
              imagePullPolicy: "Always"
              volumeMounts:
              - mountPath: /test-pod
                name: test-volume
              env:
              - name: CC_INCLUSTER 
    1
    
                value: "true"
              command:
              - "/bin/sh"
              - "-ec"
              - |
                /bin/cluster-capacity --podspec=/test-pod/pod.yaml --verbose
            restartPolicy: "Never"
            serviceAccountName: cluster-capacity-sa
            volumes:
            - name: test-volume
              configMap:
                name: cluster-capacity-configmap
    1
    必要的环境变量,使集群容量工具知道它将作为一个 pod 在集群中运行。
    ConfigMap 对象的 pod.yaml 键与 Pod spec 文件名称相同,但这不是必须的。如果这样做,输入 pod 规格文件可作为 /test-pod/pod.yaml 在 pod 中被访问。
  7. 以 pod 中作业的方式运行集群容量镜像:

    Copy to Clipboard Toggle word wrap
    $ oc create -f cluster-capacity-job.yaml
  8. 检查作业日志,以查找在集群中可调度的 pod 数量:

    Copy to Clipboard Toggle word wrap
    $ oc logs jobs/cluster-capacity-job

    输出示例

    Copy to Clipboard Toggle word wrap
    small-pod pod requirements:
            - CPU: 150m
            - Memory: 100Mi
    
    The cluster can schedule 52 instance(s) of the pod small-pod.
    
    Termination reason: Unschedulable: No nodes are available that match all of the
    following predicates:: Insufficient cpu (2).
    
    Pod distribution among nodes:
    small-pod
            - 192.168.124.214: 26 instance(s)
            - 192.168.124.120: 26 instance(s)

返回顶部
Red Hat logoGithubredditYoutubeTwitter

学习

尝试、购买和销售

社区

关于红帽文档

通过我们的产品和服务,以及可以信赖的内容,帮助红帽用户创新并实现他们的目标。 了解我们当前的更新.

让开源更具包容性

红帽致力于替换我们的代码、文档和 Web 属性中存在问题的语言。欲了解更多详情,请参阅红帽博客.

關於紅帽

我们提供强化的解决方案,使企业能够更轻松地跨平台和环境(从核心数据中心到网络边缘)工作。

Theme

© 2025 Red Hat, Inc.